Technical Tips and General Operating
Instructions
Greater benefits with the
self-contained automatic greasing systems
INSTALLATION INSTRUCTIONS FOR ALL AGS
UNITS
- Grease bearing with manual grease gun
- Unscrew greasing nipple
- Remove outlet plug
- Screw on AGS greasing unit
- Click ON switch
For more detailed instructions on the
installation of the AS 125 nit, click here.
For specific instructions on installing the
Low-Cost Unit, click here.
PRESSURE BUILD-UP OPTIONS
After activation, greasing units require
a certain set-up time to allow pressure to build up behind the piston. Greasing
starts after correct pressure is reached. Pressure will be maintained even if
the unit is switched off for a time. When the unit is switched on again,
greasing starts immediately with existing pressure. Simply set the desired
running time and mount the greasing unit.
There are 2 options to chose from. The
first is the slower way and is linked to the total greasing period that is
scheduled. The table below indicates the pressure build-up times.
| Time Setting in months |
1 |
2 |
3 |
6 |
12 |
18 |
| Dip switch |
1 |
2 |
3 |
4 |
5 |
6 |
| Pressure build-up in
days |
1 |
2 |
3 |
6 |
10 |
14 |
QUICK OPTION
If immediate greasing is desired, set all dip
switches to the ON position. Pressure build-up time will be approximately 6-8
hours. Afterwards, click switches to the desired settings. (See Lubrication
Options table below.)
TECHNICAL TIPS
A few points to remember:
- Before mounting any greasing unit, always
lightly grease the nipple manually to de-clog the bearing. This procedure will
ensure that the greasing unit can dispense the grease correctly.
- It is possible to add extension hoses for both
grease and oil lubricators. With grease, the hose or ID tubing should not
exceed 5 feet (1.5 meters). With oil, the maximum distance is 16 feet (5
meters). The recommended internal diameter of the tubing or hoses is
1/4" - 1/3" (6-8 mm). Before starting, fill grease or oil in the hoses or
tubes.
- The upper temperature range or usage is
approx. 150ºF (65ºC) - except for the Low-Cost Unit which is 104ºF (40ºC). If
ambient temperatures are higher than this, use a tube extension to increase
the distance from the heat source.
- One greasing unit is recommended for each
nipple but it is possible to use two greasing units over a T-joint for larger
greasing requirements.
- The AGS automatic lubricators grease
constantly -- no pulse greasing. If lubricating with oil, timing should be
increased by about 40% because of decreased line resistance. A check-valve of
0.2 bar is recommended.
BATTERY CAPACITY
There is never any risk of the battery going flat
before the unit is empty. Below are the details of the battery capacity and use
over a year.
Approximate battery capacity =
2400 milli-Amp
Consumption over 1 year
25 micro-Amp. x 8640 hrs =
216 milli-Amp
Indicator
light:
8 micro-Amp. x 8640 hrs
= 69 milli-Amp
Yearly consumption rate
= 285 milli-Amp
leaving over 80% reserve capacity
SYNCHRONIZATION WITH RUNNING MACHINE
It is easy to connect the AGS 125 or
EM units with a running machine.
Simply put the unit in start-up position (steps
1 to 5 above). Then extend the wire and connect it with the machine switchboard
or power relay with a non-electrical contact. When the machine is running, the
unit will lubricate. When the machine is turned off, the unit will stop.
| 30 day period = |
4 cc / day |
equivalent to 4 manual grease
gun discharges |
| 60 day period = |
2.1 cc / day |
equivalent to 2 manual grease
gun discharges |
| 90 day period = |
1.3 cc / day |
equivalent to 1 1/3 manual
grease gun discharges |
| 180 day period = |
0.7 cc / day |
equivalent to 1/2 manual
grease gun discharge |
| 360 day period = |
0.35 cc / day |
equivalent to 1/3 manual
grease gun discharge |
This table compares manual greasing to automatic
greasing over different intervals:
| Daily |
3-4 manual grease
gun discharges = |
30 day period of AGS greasing
unit |
| Every 2-3 days |
3-4 manual grease
gun discharges = |
60
day period of AGS greasing unit
|
| Weekly |
8-10 manual
grease gun discharges = |
90
day period of AGS greasing unit
|
| Every 14 days |
8-10 manual
grease gun discharges = |
180
day period of AGS greasing unit
|
| Monthly |
8-10 manual
grease gun discharges = |
360
day period of AGS greasing unit
|
125+475 Units
EM Unit
Low-Cost Unit
Central Lubers
Accessories
Tech Tips
FAQ